A variance arising in a standard costing system that indicates the difference between the actual variable manufacturing costs incurred and the expected variable manufacturing overhead costs based on some activity such as actual direct labor hours or actual machine hours. To learn more, see Explanation of Standard Costing.
Join PRO or PRO Plus and Get Lifetime Access to Our Premium Materials
Read all 2,797 reviewsFeatures
PRO
PRO Plus
Read 2,797 Testimonials