A variance arising in a standard costing system that indicates the difference between the standard amount of variable manufacturing overhead for the good units produced (standard hours times standard rate) and the variable manufacturing overhead based on actual activity (actual direct labor hours or actual machine hours times standard rate). To learn more, see Explanation of Standard Costing.
Join PRO or PRO Plus and Get Lifetime Access to Our Premium Materials
Read all 2,866 reviewsFeatures
PRO
PRO Plus
Read 2,866 Testimonials